August 30th - We went to Home depot and bought them out of switch boxes. Then after shopping we headed to the shop. I used Wayne's diagram and went around the shop and marked all the areas that need switch boxes. Then I did the first deconstruction of the back room. The bench/cupboard that was about to fall over has been removed., I now wish I had taken a picture of bench it looked really bad before I finished it off. By the time we were ready to leave Gary had put 6 headers up. We loaded the truck because we knew we would have a busy time on Monday and would probably only have an hour to get to Hammond's and back.
August 31st -Today we got to the house and took all the backbreaking floor tiles I pulled up, the window frames Gary removed, the shelving from the basement that stored all the canning jars we had to empty earlier on in the remodeling and the shelf from the back room to Hammond's Grinding and Recycling. When we returned from that adventure Gary put headers on the windows and covered the hole in the floor to the attic where we removed the fire place. Meanwhile I put switch boxes on the studs so we can be ready to do the wiring this weekend.