Friday, November 6, 2015

November 1 , 2015
Wiring has kept us busy, The insulation gets sprayed very soon and we have to have all the wiring done that is on the outside walls and the ceiling of the second floor. plus get all the wires down to the junction box in the basement. It is amazing what a tangled mess it looks like but actually we know what goes where. Labeling is very important.